Water Treatment Equipments Plant:

The water available from different water sources cannot be used directly in boilers as such. The objective of water treatment plant is to produce the boiler feed water so that there shall be:

No scale formation
No corrosion
No fouling

The treated water is called ‘De-mineralized Water’ and the plant where it is treated is called Water Treatment Plant.

Water Treatment Equipments Plant
Water Treatment Equipments Plant

Water Treatment Equipments Process:

1. Water from river

2. Flash mixer

3. Clarifier

4. Filter pack

5. Clarified water tank

6. Softening plant

7. Soft water to various units


Water Treatment Equipment Plants System:

1. Water from river 

Water comes from various rivers in water treatment plant.

2. Flash mixer 

In this segment Al2 (SO4)3, polymer etc are mixed in water.

3. Softening plant

In this segment activated carbon are used as a softener.

4. Soft water to various units

After softening of water it is supplied in various units for various purposes.


There are two types of water are prepared in water treatment plant:

1. Clarified water for washing purpose.

2. Soft water for dyeing purpose.


How to use Chemical Dosing System for Water Treatment Plant:

Chemical Dosing Systems are Used in Water Treatment Equipments System:

1. Aluminum Sulphate

2. Polyelectrolyte

3. Sodium Chloride

Chemical Dosing System for Water Treatment
Chemical Dosing System for Water Treatments

Other Product & Services :

1. Metering Pump Manufacturer India

2. Dosing Pump Manufacturer India

3. Chemical Dosing System

No comments:

Post a Comment